A04 Final module A (Villa Savoye)
The deadline of Tuesday, 06, 9, 2020 at 11.59 PM is a HARD DEADLINE, no late submission accepted.
This assignment is VERY important for your Module 1 grade so read the instructions carefully and double check your files before submitting.
Prepare the following documents (including 9 boards, 34Ă22) for your final submission on blackboard:
- Site Maps (3 altitudes: 30,000â, 3000â, 300â), extract images from Google Earth
For each image indicate the height/scale, show the north arrow on the sheet - Structural Grid @Â Â Â 1/4â=1â-0â (drawing number S-101)
This document should show only walls/columns and the structural grid
The grid should be an Xref (different dwg file) linked into your document - Plans (@ 1/4â=1â-0â)
-
- ground floor plan (drawing number A-100)
- living level plan (drawing number A-102)
- bedroom level plan (drawing number A-103)
- roof plan (drawing number A-104)
-
- elevations (@ 1/4â=1â-0â) two per page
-
- elevations 1 (2 of Northwest, Southwest, Southeast, Northeast)
- elevations 2 (2 of Northwest, Southwest, Southeast, Northeast)
-
- section (@ 1/4â=1â-0â) Optional 2nd section for extra credit
- Screenshots from the 3d model
1 to 4 (Recommended) images from the 3d model of the building on an AutoCAD sheet
All boards must contain:
- north arrow
- graphic scale (for each unique scale)
- dimensions for structural grid
- drawing titles
Submittal:
- submit BOTH the pdf and the dwg files.
- 8 boards, 34Ă22 in PDF format
- DWG files and xrefs (etransmit)
- 3d model of the building (any format: rhino, dwg, sketchup, etc)
- if possible, please combine the individual pdf pages into 1 file
- recommended, combine the individual pdf pages into 1 file.
Name files using the following naming convention:
- course_professor initials_semester_project name_student name
- (ex: ARCH2331_AA_S20_Grid_JoseSanchez-01.jpg)
- Â files not conforming to department standards may be graded.
Concrete Readings
1)
Allen and Iano, Concrete Construction
Chapter 13, pp. 515-551
Ching, Building Construction Illustrated,
Chapter 5, pp. 5.04-5.09,
Chapter 12, pp. 12.04-12.05
2)
Allen and Iano, Sitecast Concrete Framing Systems
Chapter 14, pp. 565-599
Ching, Building Construction Illustrated,
Chapter 1, pp. 1.32
Chapter 3, pp. 3.16
Chapter 6, pp. 6.04