Hello project managers you are at the finish line.

Contents

Part 3 Obstacle

In order to receive your obstacle you must first finish parts 1, 2, and 3.

1. Materials estimate

2. Touring Rider

3. Load in and load out plans for each touring venue can be inside our project estimate spreadsheet

4. Updated estimate to include union costs

Obstacle documents

1. Updated estimate to cover obstacle costs

2. 300 word essay with 2 citations

3. a ppt of not more than 12 slides to present your obstacles and what your did to overcome and achieve your goals

Turn in your updates on black board in the assignments tab

part 3 updated estimate

part 3 essay

Part 3 powerpoint

You are also being assigned TED TALK 5 it will be a good resource for your essay so do TED TALK 5 first.

Rubric for Essay, power point and presentation

PercentageDescriptionNoviceCompetentProficientComplete
10% Summary sentences that provide a short description of the obstacle, the issue or main problem you are planning to resolve or address.Ignoredone sentenceTwo sentencesThree sentences
10%Background- a short history of the tour. Purpose of the tour goals you want to achieve as the manager of the tourIgnoredone sentenceTwo sentencesThree sentences
10%Process- who and or what are involved to plan, and overcome your obstacle.Ignoredone sentenceTwo sentencesThree sentences
10%Results what are the predicted key findings or outcomes of your solution. What do you expect to achieve by fixing the problem?Ignoredone sentenceTwo sentencesThree sentences
10%Recommendations- How will you finding or conclusion of your project effect what you do next.
Is there an impact on any elements or groups of people? Will your experience change how you
do things or be a strategy for following project? Will a shift in your thinking result in new
procedures, guidelines or directions?
Ignoredone sentenceTwo sentencesThree sentences
5%Spelling and Grammar or how to loose pointsThree or more errorstwo errorsone errorno errors
45%Team members takes action to work with the team to solve the obstacle.Attends a meeting or twocontributes some contentContributes content and collaborates with the team.Collaborates with the team and presents information including deliverables and results.

Rubric for Estimate

PercentageDescriptionNoviceCompetentProficientComplete
20%Header on each page correct contentignored or incorrectevent name on each pagePM name on each pageTab labeled, PM name and event name
20%Totals sheetignored and incompleteinformation organized and labeledformulas are correct and worktotals transferred from other pages
30%ObstacleignoredObstacle sheet has a few itemsObstacle has a total on the totals pageobstacle sheet used to add labor and material costs and total is on total page
20%Other sheets updated to reflect changeignored one item updatedlabor and materials updatedlabor and materials updated and indicated on the sheets
10%Excel sheetfile not turned in or will not openpdf turned incompleted sheet turned in latecompleted sheet turned in on time