WBS Charts

Today we are going to make a WBS chart. There are a few videos in the tool tab.  

Keep the chart simple. Put the build plan on one flow line, the paint plan on a second flow line, the electrical system on a third flow line and the control system on a fourth line.

An example of the start of your WBS assignment.

Create a WBS for the Boiler project use the topics in the Rubric below as a guide.

Please turn in your homework in the assignment tab, WBS homework on Brightspace

 

DescriptionIgnored=0idea attempted=550% complete= 10 100%=20
Chart labeled correctly header
project nameTeam namestotal hours presented of entire project including project management team
scenery planCollaboration with other areas of projectsteps of 1or more day of work per step presentedtotal scenery work time presented
paint planCollaboration with other areas of projectsteps of 1or more day of work per step presentedtotal paint work time presented
electrical planCollaboration with other areas of projectsteps of 1or more day of work per step presentedtotal electrical work time presented
control system plankey connections recognizedsteps of 1or more day of work per step presentedtotal control work time presented