Hello Project Managers
Contents
Assignment
You will turn in two documents the updated spreadsheet as an excel file and the presentation as a power point file or pdf.
Down load the spreadsheet and view the Gantt chart inside the sheets section. Each task inside the Gant table was taken from the labor sheets. The Gantt chart is an estimate. Your job is to fill in the hours needed for each task. Feel free to add tasks and materials you feel are important. Each task needs to reflect one or more days of work that needs to be done to complete the project. Check your totals on the first sheet. Be sure all your formulas and links leading the totals to the first page are intact. Each material needs a price and a web link in the notes column presenting your source of information. Be sure to turn in the project as an excel file.
Boiling Elevation
Elevation and paint instructions by the original scenic designer Norma Chartoff
Presentation of outcomes
Be prepared to present your project as a 12 slides or less power point slides.
Suggested outline
- Introduction
- Summary of project
- Introduction of team and responsibilities
- key point 1
- Key point 2
- Key point 3
- Estimate totals
- Materials
- Labor
- Summary