Category Archives: Posts – Project 2

Post_5_Site_Analysis_Brayan_Roman

Site_Analysis

Posted in Brayan Roman, Post 5_Site Analysis and Interaction | Leave a comment

Post_11_Jose Campoverde_RCP

Posted in Jose Campoverde, Post 11_Reflected Ceiling Plans | Leave a comment

Post_4_Zoning_Brayan_Roman

Zoning

Posted in Brayan Roman, Post 4_Site Zoning Study | Leave a comment

Post_1_Branding_Brayan_Roman

Branding

Posted in Brayan Roman, Post 1_Branding | Leave a comment

Post_ 10 ADA Bathroom Detail

Project6 – Sheet – A104 – ADA Toilet Details`

Posted in Post 10_ADA Bathroom, Sung Jin Park | Leave a comment

Post 7 Sung Jin Park Plan, Elev & Sect

Project6 – Sheet – A101 – Floor Plans   Project6 – Sheet – A102 – Elevations   Project6 – Sheet – A103 – Sections

Posted in Post 7_Plans/Sections/Elevations, Sung Jin Park | Leave a comment

David Wu_Post 11_Reflected Ceiling Plan

Posted in David Wu, Post 11_Reflected Ceiling Plans | Leave a comment

Post_7_Jose Campoverde_FloorPlans

Posted in Jose Campoverde, Post 7_Plans/Sections/Elevations | Leave a comment

David Wu_Post 10_ADA Bathroom

Posted in David Wu, Post 10_ADA Bathroom | Leave a comment