Monthly Archives: November 2013
Week 14 Journal Entry – Cut Open The Rabbit
This Tuesday we finally moved to the final stage of our project – putting everything inside the bunny. We cut opened the rabbit by making a 3 inch hole under his front right foot, and then we took out half … Continue reading
Posted in Uncategorized
5 Comments
Week 14 Journal Entry by Frank Mason
*Not the Hell Rabbit but I think I’m pretty close I do not know what you want me to say, this is a short week but I’ll try and make it worthwhile(I won’t). For this … Continue reading
Week 13 Journal – This bit connects to that bit…
Last week I ordered an assortment of items; cables, switches, buttons, NPN transistors – most of the stuff needed to actually assemble our project, rather than just bare LED ribbons plugged into a breadboard. Unfortunately the stuff didn’t arrive until … Continue reading
Posted in Uncategorized
3 Comments
Week 13 Journal Entry
This week, The new battery for the quad rotor was ordered and we expect it to come in this upcoming week. We also measured the voltages that come out of each port of the quad rotor. We discovered that the … Continue reading
Posted in Uncategorized
1 Comment
Week 13 Journal Entry – Hell Rabbit – Code Complete
This week we’ve got a great enhancement for the project: John brought small LED lighting fixture and donated it to Hell Bunny. This fixture uses a whole bunch of red, green and blue super bright LEDs. They are three times … Continue reading
Posted in Uncategorized
Leave a comment
Week 13 Journal
This week our group focused mainly on design concepts for the blazer. The main question were, “Where should the LEDS be placed?” “Where should the mic placed?” The conclusion was the the LEDs will be place around the inner arm … Continue reading
Posted in Uncategorized
1 Comment
Week 13 – Salacious and Squalid Submariners
On this glorious day, we spent our precious time sanding the hull down to the correct proportions so that the edges would appear flush. We also made sure not to take any lip from the two halves of the sub, … Continue reading
Posted in journals
4 Comments
Week 12 Journal
All the parts for our project have been laid out and have been ordered. Anything else we my need will hopefully be minor and can easily be purchased. I am currently trying to figure out the microphone placement. Also the … Continue reading
Posted in Uncategorized
Leave a comment
Weel 13 Journal Entry by Frank Mason
For this week, our tasks have been divided in the sense that we have been working on separate portions of the hardware. With the help of Jorge, I have been to working on and testing the code for two servo … Continue reading
Posted in journals
Leave a comment
Week 13-Quadrotor
This week we were able to get some of the measurements that we needed to continue with our project. We were able to get a reading of the power coming out of the board in the quad-rotor with a electrical … Continue reading
Posted in Uncategorized
2 Comments