Information that we need: Building structure plan, concrete exam of the slab, maximum live load of the space.
Judge:
- If all indicators of building structure pass. Floor collapse by overload, the person who change the purpose of the space should take the responsibility. The building owner should create a warning sign to indicate the maximum load of the space.
- If building structure is not reach the requirement, the architect team have to take the responsibility.