My supervisor and I sat down this week to draw out the story board for his motion graphics project. Not much was done because of Thanksgiving but I still had to come in. Most of the work was to layout the story boards and see what the constraints are. Certain panels had to be reworked in order for the scene to work. Other panels were just taken out because it didn’t fit the style. One major constraint we had discussed was the length (time) of the project. My supervisor didn’t want this more then 2 minutes. Since the project is a motion graphics introduction on a site, most people wouldn’t sit through more then two minutes. Most people don’t want to sit through 15 seconds (vine videos) so we had to make sure that the first few seconds were critical in drawing in the audience.