A floor collapsed during a party held in a meeting room of a residential building. The building owner should post a sign of what the max occupancy of the meeting room is. The information that should be investigated is maximum live load of the space and the concrete slab test results. The architect should be responsible if the building concrete does not reach its requirement. I would factor in the building owner or architect to be liable.