If I were investigating this situation, the required information from the DOB would the maximum capacity load of the room and floor. The use of the room, concrete test results and the construction documents. The responsibility would be on the owner or the architect. The owner for occupancy limit and wrong use of the room. Meeting room not party room. The architect for structural problems and concrete results do no meet the requirement