Another week of work and I can see things coming together. The majority of the time is spent sanding and gluing; however this part takes a while because the sanding has to be precise and the glue has to dry. When ran into issues with the glues that we had previously tried; however I we finally found one that worked. Mike obtained a great smelling cement glue strong enough to bond to this particular type of plastic. By the end of this week the sub should really take shape. The movable parts are being assembled and added to the hull of the sub. as the sanding comes to an end we are being careful that all pieces fits as they should.
-
Recent Posts
Recent Comments
- Juan P. Correa on Aipek HD Digital Camcorder Tear Down Pictures
- Matthew on Lab Report UMAX Astra Pix 670
- Creed1011 on Lab Report
- Matthew on Blackberry Phone Examination.
- zohaib on Lab report – Samsung SGH-i6079/4/2014
Archives
Categories
Meta