Ambidextrous Controller Group (5)

The cnc mill was nearly finished and Remy forwarded the project to me. I recognized the problem but it was to late for me to reassemble it. The problem began with a spring and bolt. The bolt could not fasten to the other bolt with the spring in the middle. I used a clamp and a few different types of vice grips and pliers to suppress the first bolt to the other. With the spring pushing against it and the rod’s threads rejecting the second bolt, progress was impossible. To get to this step I disassemble half of the cnc mill, and this process was done by unscrewing the bolts, nuts, and screws. The cnc mill had to be continued from where I left off, but to finish I needed help. The crew had left for the day and I closed up the lab leaving the cnc mill with the tightened parts in storage.

This entry was posted in Uncategorized and tagged , , . Bookmark the permalink.

Leave a Reply