The cnc mill is almost finished given that I helped to assemble steps 139-200. The assembly of rods and screws wasn’t a walk in the park. Many mistakes happened because of new bolts and screws were added for these tasks. Along with that I made a couple of mistakes in bolting down server motors. They were to loose, and Remy rebolted them with a electric hand drill. Like before this was appropiate and necessary for the project to survive. The success of using the electric drill brought us into the 200 range within the completion of the diagram. Also without it Remy would have been exhausted as he used his force to staple about 30 screws into the rods assembly.
-