1. Planing and Scaling
1.1 Observe reference scenes in movie | take screenshots
1.2 Sketch observations | make notes of color tones | list props
1.3 Estimate and record realistic measurements of the set
1.4 Set realistic measurements to scale using the 1” scale
1.5 Plan out what materials will be needed | purchase | gather materials
2. Prepping the Set
2.1 Measure cardboard, foam core boards, and card stock paper to scale
2.2 Cut boards and paper accordingly and carefully
2.3 Organize cut pieces to prep for attachment
3. Designing the Set
3.1 Prep set for paint, draw placement for wallpaper, floor tiles, and staircases
3.2 Prepare paints, mix on palette to match desired tones
3.3 Paint set, and apply tiles according to matching placement
4. Putting the Set Together
4.1 Let the paint and glue dry
4.2 One by one attach each wall, then attach walls to floor and let dry
5. Build, Paint, Place Props
5.1 Assemble any required props and figures with recycled materials, glue together and let dry
5.2 Paint props accordingly, and let dry
5.3 Place, mount, or glue props accurately on set
5.4 Make any minor adjustments for accuracy
6. Shooting the set
6.1 Prop set onto secure area (table/platform/stool)
6.2 Prepare desired lighting (sunlight or artificial lighting)
6.3 Photograph set, then shoot quick stop motion of toy figurine on set
6.4 Prepare video using video editing software of choice
6.5 Post to YouTube and Openlab