Categories
- 16 Midterm
- 18 Final
- Adam Elkhouly
- Amal Hashem
- Anjella Messian
- Assignment 1
- Assignment 10
- Assignment 11
- Assignment 12
- Assignment 13
- Assignment 14
- Assignment 17
- Assignment 2
- Assignment 3
- Assignment 4
- Assignment 5
- Assignment 6
- Assignment 7
- Assignment 8
- Assignment 9
- Assignments
- Breno Bondarenko Costa
- Class Member
- Diego Ortega
- Jonathan Ramirez
- Keith Alfaro
- LeslieARosas
- Michelle Yang
- Olivier de Marc
- Patricia Paredes Garcia
- Paula Damasceno
- SterlinAdames
- Uncategorized
-
Recent Posts
Prefab-Modular Construction Case Studies-Patricia Paredes
Posted in Assignment 9, Patricia Paredes Garcia
Leave a comment
Prefab.home.research.Michelle.Yang
Michelle.Yang-Prefab.home.research
Posted in Uncategorized
1 Comment
PREFAB._RESEARCH_DIEGO_ORTEGA
Finnish architect company (NEAPO)
Completed the first mobile apartment building in the world.
The building is located in Turku, Finland
-A 3-story, steel framed building
-length is 108 feet
– 40 feet high
-Weight is 485,017 pounds
Read more: The World’s First Truly Mobile Apartment Building is Completed in Finland | Inhabitat – Sustainable Design Innovation, Eco Architecture, Green Building
Posted in Assignment 10, Diego Ortega
Leave a comment
A10 prefab house
– Maison en bois en kit (MBK)
Wood frame prefab house
Location: Normandy, France
https://www.youtube.com/watch?v=YY-cNVzzk28
– Guillerm Habitat
Concrete prefab house
Location: Bretagne, France
Posted in Assignment 10, Olivier de Marc
Leave a comment
REVIT Massing
Revit Massing
https://www.mediafire.com/?td2ko48s1n00kgq
Revit Model-Update_Patricia Paredes
https://www.dropbox.com/home/ARCH%203630
Posted in Patricia Paredes Garcia
Leave a comment
REVIT_MODEL_DIEGO_ORTEGA_2
https://dl.dropboxusercontent.com/u/65553746/solar%20project.rvt
Posted in Uncategorized
Leave a comment