Class Info
- Date: Friday 3/3
- Meeting Info: Meeting in-person in Voorhees V-305
To-Do Before Class
- Reading 4 – Building Materials 12.02-12.08, 12.10-12.12
- Group 2 to present Reading 4 next class
- Reading presentation groups listed here
- Refer to the reading list on the ARCH 1231 Course Hub for specific pages
- Submit scanned + formatted Reading Notes+ Sketches
- Module I: Case Study Building
- Complete First Floor Plan + Building Section
- Using the floor plan and building section as references, block out the Federal Hall Building Elevation – Grids, Levels, Building Geometry
- Post to Miro by Friday 3/3, 12pm
Topic(s)
- Module 1 Wrap Up
- Module 2 Intro
- Materials + Properties – Masonry
Activities
- Pin Up
- Review Module 1 drawing progress
- Module 2 Intro
- Overview of Module 2 drawing assignments
- Reading 4 Presentation
- Group 2 to present Reading 4
- Materials Recap:
- Stone + Concrete Masonry
- Module I: Case Study Building – Elevation
- Review next steps for setting up the elevation drawing
To-Do After Class
- Reading 5 – Wall Systems + Masonry Walls
5 | Wall Systems | 5.02-5.03 |
5 | Masonry Walls | 5.14-5.18 |
5 | Masonry Arches + Lintels | 5.20-5.21 |
5 | Masonry Wall Sections | 5.23-5.25 |
5 | Masonry Wall Bonding | 5.26-5.27 |
5 | Stone Masonry | 5.33-5.34 |
- Group 3 to present Reading 5 next class
- Reading presentation groups listed here
- Refer to the reading list on the ARCH 1231 Course Hub for specific pages
- Submit scanned + formatted Reading Notes+ Sketches
- In addition to your notes + sketches, prepare the following and be ready to discuss next class:
- Find a building near you that uses brick masonry at its exterior walls
- Photograph the building and try to identify if the building is using the brick as a primary structural material, or if it is only a veneer
- Pay close attention to the brick bonding (which type of bonding is used?)
- Also pay careful attention to the openings (arches? lintels? something else?)
- Post your photo and assessment to Miro by Friday 3/10, 12pm
- Module I: Case Study Building – Final Drawings
- Complete Plan Geometry Diagram, First Floor Plan, Section, + Elevation drawings
- Post final drawings to Miro by Friday 3/10, 12pm
Leave a Reply