To-Do Before Class
- Reading 4 – Building Materials 12.02-12.08, 12.10-12.12
- Group 2 to present Reading 4 next class
- Reading presentation groups listed here
- Refer to the reading list on the ARCH 1231 Course Hub for specific pages
- Submit scanned + formatted Reading Notes+ Sketches
- Module I: Case Study Building – First Floor Plan
- Complete First Floor Plan
- Post to Miro by Friday 10/7, 12pm
- Module 1: Case Study Building – Section
- Complete Building Section
- Post to Miro by Friday 10/7, 12pm
- Module 1: Case Study Building – Elevation
- Using the floor plan and building section as references, block out the Federal Hall Building Elevation
- Have grids and levels laid out and ready to review with by next class
- Post to Miro by Friday 10/7, 12pm
Topic(s)
- Module 1 Wrap Up
- Module 2 Intro
- Materials + Properties – Masonry
Activities
- Pin Up
- Review Module 1 drawing progress
- Module 2 Intro
- Overview of Module 2 drawing assignments
- Reading 4 Presentation
- Group 2 to present Reading 4
- Materials Recap:
- Stone + Concrete Masonry
- Module I: Case Study Building – Elevation
- Review next steps for setting up the elevation drawing
To-Do After Class
- Reading 5 – Wall Systems + Masonry Walls
- Group 3 to present Reading 5 next class
- Reading presentation groups listed here
- Refer to the reading list on the ARCH 1231 Course Hub for specific pages
- Submit scanned + formatted Reading Notes+ Sketches
- In addition to your notes + sketches, prepare the following and be ready to discuss next class:
- Find a building near you that uses brick masonry at its exterior walls
- Photograph the building and try to identify if the building is using the brick as a primary structural material, or if it is only a veneer
- Pay close attention to the brick bonding (which type of bonding is used?)
- Also pay careful attention to the openings (arches? lintels? something else?)
- Post your photo and assessment to Miro by Friday 10/14, 12pm
- Module I: Case Study Building – Final Drawings
- Complete Plan Geometry Diagram, First Floor Plan, Section, + Elevation drawings