Progress Deadline for Wednesday at Midnight

You work as a team to determine the dimensions of your case study building but each of you must draw your own Revit files – no sharing of files.  You may share your research.

Complete the following for your case study:  INDIVIDUAL WORK

  • Draw Grids
  • Draw levels
  • Create a titleblock and format the grids – try to use 1/8″ scale

Upload the following to Blackboard by midnight Wednesday

  • Your Revit file
  • A PDF plot of the titleblock with grids.

Be prepared to draw the following during next class:

  • Foundation Wall and Footing
  • Structural Columns
  • Floor slabs – basement to the roof

Leave a Reply

Your email address will not be published. Required fields are marked *