https://www.pdfforge.org/pdfcreator This free software can be installed at home and will allow you to print to PDF in Revit.
Plotting PDF’s at home for free!!!
Project Selection –
I have reviewed all of the semester project selections that were uploaded as required. Please read the comments I have written. You will find the following general comments: Your building was accepted – if it met all the criteria or was very close Your building was accepted – but required minor modification. This typically means […]
Connections Deadline Reminder
The connections assignment is due Wednesday by Midnight. Also plot your drawing 11 x 17 for Thursdays Class. Upload both Revit File and PDF to Blackboard. You do not need to upload your families.
Concrete Slab to Curtain Wall Connections
https://www.halfen.com/us/3226/product-ranges/construction/anchoring-systems/hcw-curtain-wall-system/introduction/
Steel Footing Connections
Steel Connections
Grading Statistics for Scavenger Hunt
These are the statistics for the entire class for both assignments. Some students received lower grades for the “Best Sheet” because their uploads to blackboard are either missing or incomplete. Please upload these ASAP and they will be regraded – provided they are received before the next class meeting.
All Assignment Postings to Blackboard will be Due Midnight the day before class
All assignments are required to be posted in Blackboard. I will clarify as we go if they require plotting or printing. When they do require printing/plotting this must always be done before class begins – so plan your time accordingly. My deadlines for submission to blackboard for all my classes in the past, has always […]
Current Assignments
There are two current assignments: Confirmation of your selected project – please bring in an 8 1/2 x 11 sheet describing your selection. The connections assignments This is a progress grade – submission is not optional. Please upload a PDF of the current version of your work – this upload is to be completed by Midnight the day before […]
Revit Workshops
JP – one of my best former students is running workshops for us – while he covers specific topics at each session he also welcomes questions on any aspect of the program – so I highly recommend attending to everyone. NYCCTfab_Workshops_Fall2019_Revit
Assignments and Grading
Your grades for today are posted in Blackboard. For Thursday complete the following: Best sheet – scavenger Hunt – plotted 22 x 34 – uploaded by noon to blackboard on Thursday Connections assignments – build 2 families one for beam one for column – align these to match the ching drawings – format views on […]
Meeting Deadlines is not optional
I am aware that some of you will not be happy reading this – but it is important you understand your need to complete work on time and have it ready when class begins. Today’s pinup was due at the start of class. Several of you plotted during the break and pinned up at the […]
Scavenger Hunt Assignment Deadline and Clarifications
Please read this in its entirety and email me should there be any questions. (prof.paul.king@Gmail.com) Due as a graded assignment for next class – (Tuesday September 10th) Scavenger Hunt – three studies. Please create one sheet 22 x 34 for each. You are to plot print as follows: Your best sheet – plotted full size […]
Missing Headphones – Please return if found
Someone may have accidentally walked out of class last week with headphones belonging of one of the students. If found please return to my office – no questions asked. Prof. King