I completed grading all work handed in to date. You should login to blackboard to review your grades. Keep in mind when you do not complete an assignment or part of an assignment it hurts your grade. This has dropped grades this semester. Please try to complete and upload all assignments on a timely basis and also be certain that for any assignment you complete all of the items that are required.
The team presentation was graded as follows:
- 04 Team Bldg Analysis Presentation (this is the group grade shared by the team)
- 04.1 Precedent Study (individual grade – if you got a 0 it means you did not complete this)
- 04.2 Solid Material (individual grade – if you got a 0 it means you did make a choice or showed no images)
- 04.3 Glass Material (individual grade – if you got a 0 it means you did make a choice or showed no images)
- 04.4 Overall Individual Presentation Grade (This is a compilation of 04.1, 04.2 & 04.3)
Additionally I added a blackboard category in assignments that will tell you how you are doing so far this semester.
- 00 Semester Grade to Date (this is an indication of the grade you would receive if the semester were to end today)
This grade will only be upgraded again at mid-semester. It is still early so a lot can change this grade (up or down) – in particular when you complete the set of drawings in Revit)
2 Responses to Grading to Date and What is means.