Facade Material and Curtain Wall Installation

Metal Panels Installation Video

  • 0:13 : Tools
  • 0:40 : Rivet Attachment
  • 0:54 : Drilling Metal Base
  • 1:08 : Fastening Screws for Panel Attachment
  • 1:25 : Caulk Joint Attachment of Panels
  • 1:59 : Buildings with Panels

Curtain Wall Installation Video

  • 0:13 : Interior Framing
  • 0:22 : Glass Assembly
  • 0:33 : Thermal Barrier
  • 0:56 : Exterior Framing
  • 1:19 : Anchoring Assembly at Mullion
  • 2:02 : Installation of Glass Panels

 

 

Kalzip FC rainscreebn System and Curtain wall installation

Kalzip FC rainscreen system – Louisiana Superdome, New Orleans
https://youtu.be/fTxb2fhDKr0

0:29- 1:40 manufacturing

2:22 overview of façade system

2:30- 2:51 installation sequence

  • Clips secured to wall,
  • “L” profile is attached to clips
  • Mullion Bar is attached to “L” profile
  • Retainer clips installed in mullion
  • siding is clipped in position

3:00- 5:30 Installation

  • L profile installation to adjustable bracket
  • Mullion bar clamped to L profile
  • Alignment of sub-framing
  • Mullion bar fastened to L profile
  • Trimming of panel ends
  • Panel installation

unitized curtain wall installation https://youtu.be/KYXpMkujo_8

0:36 Bracket Installation

0:57 Panel Installation

Video Research Assignment.

Neolith  Facade systems

Opaque Material – Hc System Installation.

  • 0:20 – Thermal insulation
  • 0:25 – Energy saving
  • 0:28- Impermeability
  • 0:32- Insulation
  • 0:37- Planning and measurements.
  • 1:05-Bracket and Thermal Insulation Installation.
  • 1:23-Hc system Installation.
  • 2:03-End of Hc System installation.

Glass Curtain Wall

  • 0:12-fins
  • 0:36-point fixed Facade.
  • 1:26-point fixed fittings.

Facade panel and Curtain wall installation

Trespa panel

  • :20 Tools
  • 1:24-2:04 insure panel handling and safety
  • 2:14 anchor points of panels
  • 2:20-2:54 fixed and sliding points with drill bit size
  • 3:03 anchor points and fixed distances
  • 3:30-3:44 installation of layers
  • 3:51-4:16 distancing of panels from wall and other objects
  • 4:29-4:35 panel requirements
  • 4:44-4:57 corner requirement

Kawneer curtain wall

 

 

  • 1:56 circuit of assembly
  • 2:15 assembly of window and glass framing
  • 2:35 assembly of window fasteners to building
  • 3:08 thermal durability
  • 3:15 fire resistance
  • 3:25 window durability
  • 4:00 active fail safe