Category: 2:30 PM – 5:30 PM – King
Preliminary Presentation
Preliminary presentation
Carrie Mendoza- Harmon Curtain Wall
- 1:39 Placing curtain wall anchors.
- 2:03 Team members placing curtain walls into place.
- 2:24 Locking the curtain wall onto curtain wall anchors.
- 2:30 Checking for accuracy.
- 2:33 Weather resistance seal.
- 2:43 Fire Protection between the slab and curtain wall
- 3:00 Smoke Seal
- 3:04 Seal brackets and stool trend
- Temporary Coating
Facade Material and Curtain Wall Installation
Metal Panels Installation Video
- 0:13 : Tools
- 0:40 : Rivet Attachment
- 0:54 : Drilling Metal Base
- 1:08 : Fastening Screws for Panel Attachment
- 1:25 : Caulk Joint Attachment of Panels
- 1:59 : Buildings with Panels
Curtain Wall Installation Video
- 0:13 : Interior Framing
- 0:22 : Glass Assembly
- 0:33 : Thermal Barrier
- 0:56 : Exterior Framing
- 1:19 : Anchoring Assembly at Mullion
- 2:02 : Installation of Glass Panels
▶ Perforated Metal Cladding – Custom Pattern – Architectural Sheet Metal Work
Hendrick Architectural Perforated Metal Cladding
0:40 Manufacture Size
Kalzip FC rainscreebn System and Curtain wall installation
Kalzip FC rainscreen system – Louisiana Superdome, New Orleans
https://youtu.be/fTxb2fhDKr0
0:29- 1:40 manufacturing
2:22 overview of façade system
2:30- 2:51 installation sequence
- Clips secured to wall,
- “L” profile is attached to clips
- Mullion Bar is attached to “L” profile
- Retainer clips installed in mullion
- siding is clipped in position
3:00- 5:30 Installation
- L profile installation to adjustable bracket
- Mullion bar clamped to L profile
- Alignment of sub-framing
- Mullion bar fastened to L profile
- Trimming of panel ends
- Panel installation
unitized curtain wall installation https://youtu.be/KYXpMkujo_8
0:36 Bracket Installation
0:57 Panel Installation
video research assignmnet-meifen
https://www.youtube.com/watch?v=wk6zT872cSc&feature=youtu.be
Alucobond®: Rainscreen Fabrication
0: 01- Confirm the position and fix the metal plate
0: 06-Insert screws
0 : 08- Prepare ceramic plate and assemble
0: 31-installed on a fixed metal plate
0: 42-repeat
1: 00-Display side content
Video Research Assignment.
Neolith Facade systems
Opaque Material – Hc System Installation.
- 0:20 – Thermal insulation
- 0:25 – Energy saving
- 0:28- Impermeability
- 0:32- Insulation
- 0:37- Planning and measurements.
- 1:05-Bracket and Thermal Insulation Installation.
- 1:23-Hc system Installation.
- 2:03-End of Hc System installation.
Glass Curtain Wall
- 0:12-fins
- 0:36-point fixed Facade.
- 1:26-point fixed fittings.
Facade panel and Curtain wall installation
Trespa panel
- :20 Tools
- 1:24-2:04 insure panel handling and safety
- 2:14 anchor points of panels
- 2:20-2:54 fixed and sliding points with drill bit size
- 3:03 anchor points and fixed distances
- 3:30-3:44 installation of layers
- 3:51-4:16 distancing of panels from wall and other objects
- 4:29-4:35 panel requirements
- 4:44-4:57 corner requirement
Kawneer curtain wall
- 1:56 circuit of assembly
- 2:15 assembly of window and glass framing
- 2:35 assembly of window fasteners to building
- 3:08 thermal durability
- 3:15 fire resistance
- 3:25 window durability
- 4:00 active fail safe