Video Research Assignment.

Neolith  Facade systems

Opaque Material – Hc System Installation.

  • 0:20 – Thermal insulation
  • 0:25 – Energy saving
  • 0:28- Impermeability
  • 0:32- Insulation
  • 0:37- Planning and measurements.
  • 1:05-Bracket and Thermal Insulation Installation.
  • 1:23-Hc system Installation.
  • 2:03-End of Hc System installation.

Glass Curtain Wall

  • 0:12-fins
  • 0:36-point fixed Facade.
  • 1:26-point fixed fittings.

Leave a Reply

Your email address will not be published. Required fields are marked *