Project Requirements and Documentation:
Brownstone RFP: Grading Rubric
Final Due Date:
**Refer to instructions for benchmark due dates**
Links:
Interesting video about Passive Houses in Brooklyn:
https://www.youtube.com/watch?v=jv5JiALUWW8
NYC DOB Energy Code Resource:
Windows and Skylights – slides 53-55
http://www.nyc.gov/html/dob/downloads/pdf/2.1.12-Residential_Module.pdf
Presentations:
Phase 2: Technical Proposal and Design Research
Due:
Phase 3: Construction Schedule and Cost Estimate
Due:
Due:
Phase 5: Draft Design Response
Due:
*You must submit your final bound Design Response Booklet at the start of class, late assignments will not be accepted* Non-bound or unprofessional documents will be severely downgraded.*
Booklet Requirements:
1. Cover Page
2. Table of Contents
3. Documents from all Project Phases, as described in Phase 5 instructions, including your power point presentation.
4. Printed and Bound Booklet prepared prior to class: Clear cover with binding comb, professional binding, or slide binding (with stapled document). Your project will be downgraded 10 points minimum for incorrect booklet presentation.
5. Professional, consistent formatting.
Reference RFP Responses:
http://www.maricopa.edu/purchasing/awards/3029_10/Palantir.pdf
http://www.londonderrynh.org/Pages/LondonderryNH_BComm/planning/mpproposals/VHBproposal.pdf
Phase 6: PowerPoint Presentation
Due: