Project Requirements and Documentation:
Brownstone RFP: Grading Rubric
Final Due Date:
**Refer to instructions for benchmark due dates**
Links:
Interesting video about Passive Houses in Brooklyn:
https://www.youtube.com/watch?v=jv5JiALUWW8
NYC DOB Energy Code Resource:
Windows and Skylights – slides 53-55
http://www.nyc.gov/html/dob/downloads/pdf/2.1.12-Residential_Module.pdf
Presentations:
Phase 2: Technical Proposal and Design Research
Due:
Phase 3: Construction Schedule and Cost Estimate
Due:
Due:
Phase 5: Draft Design Response
Due:
*You must submit your final bound Design Response Booklet at the start of class, late assignments will not be accepted*Â Non-bound or unprofessional documents will be severely downgraded.*
Booklet Requirements:
1. Cover Page
2. Table of Contents
3. Documents from all Project Phases, as described in Phase 5 instructions, including your power point presentation.
4. Printed and Bound Booklet prepared prior to class: Clear cover with binding comb, professional binding, or slide binding (with stapled document). Â Your project will be downgraded 10 points minimum for incorrect booklet presentation.
5. Professional, consistent formatting.
Reference RFP Responses:
http://www.maricopa.edu/purchasing/awards/3029_10/Palantir.pdf
http://www.londonderrynh.org/Pages/LondonderryNH_BComm/planning/mpproposals/VHBproposal.pdf
Phase 6: PowerPoint Presentation
Due: