Postings for your use:
- I will post the videos of today’s class
Current Assignment:
- Special Zoning Envelope (Team – complete for Monday)
- As a team review each of your individual zoning envelopes. Agree on what rules and composite version makes sense – this will be the groups proposed special zoning envelope – update your rules to match
- If you disagree with the team and want to go rogue – you can by applying for a variance when you begin the design phase.
- Special Zoning FAR and OSR Study (Individual – complete for Monday)
- As a team calculate your FAR and OSR requirements.
- As an individual use the FAR (think of this as clay) and mold proposed massing of your buildings within the zoning envelope. This is the start of you individual design.
- Site Engineering (Class project – complete for Monday)
- Create a reference drawing of the base that would exist after the highway is re-built and the entrances/exits are decked over. This is the base we all work with.
- Site Strategy (Team – complete for Monday)
- Working with our new “Site Engineering” and the “Zoning Envelope” review your inventory and refine your site strategy overlay drawings.
- Covid-19 Rules (Team then Class – for a future date)
- Each team should add this to their zoning document – and then we will create a class wide document. Please be prepared to discuss this as we develop our housing.
Screen Captures from Class: