Project 2 requirements – Presentation 5/21 8:30am

Everyone Presents or will be marked down 1 full letter grade.

Precedent Studies

Site Analysis

Floor Plans – 1 per sheet with materials

1. Typical Floor plans of the Rooms including Furniture

2. Lounge Floor plan – with furniture

Building Sections – including the commercial space – Long and Short

Elevations – 2 total:  long and short

RCP – reflected ceiling – Lounge and a typical room floor – with images of lights

Blow up of one room – showing furniture, materials, bathroom fixtures, tiling, flooring, lighting…..plan and two elevations

Model – physical for Prof Lia – Renderings….. TBD

 

https://mailcitytechcuny-my.sharepoint.com/personal/francis_kwok_mail_citytech_cuny_edu/Documents/project%202FINALs.pdf?slrid=2784639e-4029-5000-c0f5-29284c3d541d

https://www.dropbox.com/s/401z6txuv8j0bl5/FINAL%20HOSTEL%20PRESENTAION.pdf?dl=0

 

grading final update