For Monday, Develop massing (physical) models 1/8″ = 1′-0″ of the new addition on the base of your current site. You must continue with you first concept – and will add 3-5 floors 35′-60′. Your new addition must sit on the base of the existing building, without the sloped roof, but including the triangle portion of the original building.
Create the base model and develop 3 options for the massing of new addition. Think about the elements from the site analysis to help organize your massing. Remember the core – (2 fire stairs and 2 elevators). All hostel sleeping rooms must have windows.
Be prepared to bring in 3 models and sketches of possible layouts of the interior – plans/sections.