Assignment 1 Schedule **updated

 

Week 1:           Jan 29th, 2018              Field trip/ Introduction to project
                            Assignment 1: Group Site Analysis due 2/5
 
                            Feb 1st, 2018               Field trip/ Commercial spaces
Assignment 2: Commercial Precedent study due 2/8
 
Week 2             Feb 5th,2018                  Site analysis, (as a group) Presentations
 
                            Feb 8th, 2018               Logo Case studies and 3 concept models
                            Assignment 3:  Logo Development in class – Due end of class 2/8
                            Assignment 4:   3 Concept models + site Model due 2/15
             
 
Week 3             Feb 15th, 2018                           Review of Site model, Concept Models
                            Assignment 5: Final hybrid and site model due 2/19
 
                            Feb 19th, 2018             Hybrid Concept Models &Drawings
                            Assignment 6: Drawings and diagrams of hybrid model – plans/sections/ list of spaces
 
Week 4             Feb 22nd, 2018            Spatial Organization-Matrix/bubble diagram plans/section
                            Assignment 7: Matrix/bubble diagram due 2/26
 
                            Feb 26th, 2018             Schematic and program proposal
                            Assignment 8: diagrammatic plans/sections due 3/1
 
 
Week 5             March 1st. 2018          Discussion of commercial interior materials, finishes and colors. Flooring lecture and furniture lecture. Introduction to material Journal
 
                            March 5th,2018           Review
Week 6             March 8th, 2018          Mid-term Pin up
                                                                      Floor Plans with furniture layout 
                                                                      Exterior elevation in context
                                                                      Interior elevations
                                                                      Sections
                                                                      Lighting layout 
                                                                      Color scheme
                                                                      3d representation, physical model and digital model
 
 
                            March 12th,2018        Lighting layout, Discussion of different types of lighting, layouts and  
                                                         
Week 7             Mar 15th ,2018             Commercial bathroom discussion including material, fixtures and ADA
                                                                      layout.  Enlarged bathroom with materials and fixture required.
 
                            Mar19th, 2018             Storefront and signage. Discussion of entrance, signage, exterior space and                                                                                                               .                                                                 elevation.  Elevation incorporating these elements required
                            Mar 22nd, 2018             Furniture review + Desk Crits
Week 8             Mar 26th, 2018             Final Review
                            Mar 29th, 2018             Final PresentationALL PROJECTS ARE DUE
 
 
 
Final presentation: (in addition to midterm requirements)
Long and Short Sections
Enlarged Bathroom – plans and interior elevations with all materials, fixtures
Further 3d representation (perspectives, models etc.) adequate to convey the interior design.
Furniture plans including furniture cuts
Lighting plans including fixture cuts
Materials board
 
All drawings should be rendered. The layout should be a composition