Week 1: Aug 27th, 2018 Field trip/ Introduction to project
Assignment 1: Group Site Analysis due 9/6
Aug 30th, 2018 Commercial spaces
Assignment 2: Commercial Precedent study due 9/5
Week 2
Sept 5th, 2018 Commercial Precedent Presentations
Sept 6th, 2018 Site analysis, (as a group) Presentations
Week 3
Sept 13th, 2018 Logo Case studies and 3 concept models
Assignment 3: Logo Development in class – Due end of class 9/13
Assignment 4: 3 Concept models + site Model due 9/17
Sept 17th, 2018 Review of Site model, Concept Models
Assignment 5: Final hybrid and site model due 9/20
Week 4 Sept 20th, 2018 Hybrid Concept Models &Drawings
Assignment 6: Drawings and diagrams of hybrid model – plans/sections/ list of spaces
Sept 24th, 2018 Spatial Organization-Matrix/bubble diagram plans/section
Assignment 7: Matrix/bubble diagram due 9/24
Week 5 Sept 27th, 2018 Schematic and program proposal
Assignment 8: diagrammatic plans/sections due 10/1
Oct 1st. 2018 Discussion of commercial interior materials, finishes and colors. Flooring lecture and furniture lecture.
Week 6 Oct 4th,2018 Review
Oct 11th,2018 Mid-term Pin up
Floor Plans with furniture layout
Exterior elevation in context
Interior elevations
Sections
Lighting layout
Color scheme
3d representation, physical model and digital model
Week 7 Oct 15th, 2018 Lighting layout, Discussion of different types of lighting, layouts and
Oct 18th,2018 Commercial bathroom discussion including material, fixtures and ADA
layout. Enlarged bathroom with materials and fixture required.
Week 8 Oct 22nd ,2018 Storefront and signage. Discussion of entrance, signage, exterior space and . elevation. Elevation incorporating these elements required
Furniture review + Desk Crits
Oct 25th, 2018 Final Review
Oct 29th, 2018 Final Presentation– ALL PROJECTS ARE DUE
Final presentation: (in addition to midterm requirements)
Please refer to posted grading sheet for Project 1