For Thursday, Develop massing (physical) models 1/8″ = 1′-0″ of the new addition on the base of your current site. You must continue with you first concept – and will add 3-5 floors 35′-60′. Your new addition must site on the base of the existing building, without the sloped roof.
Create the base model and develop 3 options for the massing of new addition. Think about the elements from the site analysis to help organize your massing. Remember the core – (2 fire stairs and 2 elevators). All hostel sleeping rooms must have windows.
Be prepared to bring in 3 models and sketches of possible layouts of the interior – plans/sections.