For next class:
- the massing should be finalized
- Lounge floorpan should be blocked out
- Floor plans for rooms should be blocked out
- Program requirements should be all located (number of rooms should accounted for-102 rooms min.)
- Core should work from the roof to the ground level
- Each room type should be blocked out – single, 4,6,8 bed room types – blow up sheets
Continue to work in plan, section and massing throughout your work, remembering your parti.