P2: Assignment 5

For next class:

  1. the massing should be finalized
  2. Lounge floorpan should be blocked out
  3. Floor plans for rooms should be blocked out
  4. Program requirements should be all located (number of rooms should accounted for-102 rooms min.)
  5. Core should work from the roof to the ground level
  6. Each room type should be blocked out – single, 4,6,8 bed room types – blow up sheets

Continue to work in plan, section and massing throughout your work, remembering your parti.