Wednesday Progress Posting #3- March 7

Continue to develop your building:

  • Add sheets for all your floor plans. Name and number them properly. (don’t worry about laying them all out yet)
  • The drawings list schedule should update.
  • Work on finishing the building as follows:
    • Exterior wall from level 1 to roof
    • Basement Foundation wall with perimeter footing.
    • Add exterior Windows – you may need to load some families and customize these
  • Be prepared to work on the floor plan for next class.

 