Arch2431_SP2020_Assignment_ Revit Screen Capture_Ousmane Camara
Category: Watchlist
Facade Material and Curtain Wall Installation
Metal Panels Installation Video
- 0:13 : Tools
- 0:40 : Rivet Attachment
- 0:54 : Drilling Metal Base
- 1:08 : Fastening Screws for Panel Attachment
- 1:25 : Caulk Joint Attachment of Panels
- 1:59 : Buildings with Panels
Curtain Wall Installation Video
- 0:13 : Interior Framing
- 0:22 : Glass Assembly
- 0:33 : Thermal Barrier
- 0:56 : Exterior Framing
- 1:19 : Anchoring Assembly at Mullion
- 2:02 : Installation of Glass Panels
▶ Perforated Metal Cladding – Custom Pattern – Architectural Sheet Metal Work
Hendrick Architectural Perforated Metal Cladding
0:40 Manufacture Size
Video Research – VMZINC (DRI-DESIGN) AND 1600SS CURTAIN WALL (KAWNEER) – DOLMA TSERING
VMZINC (DRI-DESIGN)
1:18 – BRACKETS INSTALLATION
1:28 – RAFTERS FIXED TO BRACKETS
1:33 – PERFORATED BASE TRIM INSTALLATION
1:51 – INSTALLATION OF INTERLOCKING PANELS
2:30 – INSTALLATION OF SPLICE PLATE
3:13 – FLASHING INSTALLATION
1600SS CURTAIN WALL (KAWNEER)
2:58 – INSTALLATION OF RAIL
3:04 – APPLYING SEALANT
4:14 – SETTING CHICKEN HEAD
4:59 – INSTALLING ANCHOR
6:19 – INSTALLATION OF CRITICAL SEAL
9:04 – SETTING THE UNITIZED PANEL
Kalzip FC rainscreebn System and Curtain wall installation
Kalzip FC rainscreen system – Louisiana Superdome, New Orleans
https://youtu.be/fTxb2fhDKr0
0:29- 1:40 manufacturing
2:22 overview of façade system
2:30- 2:51 installation sequence
- Clips secured to wall,
- “L” profile is attached to clips
- Mullion Bar is attached to “L” profile
- Retainer clips installed in mullion
- siding is clipped in position
3:00- 5:30 Installation
- L profile installation to adjustable bracket
- Mullion bar clamped to L profile
- Alignment of sub-framing
- Mullion bar fastened to L profile
- Trimming of panel ends
- Panel installation
unitized curtain wall installation https://youtu.be/KYXpMkujo_8
0:36 Bracket Installation
0:57 Panel Installation
Video Research Assignment.
Neolith Facade systems
Opaque Material – Hc System Installation.
- 0:20 – Thermal insulation
- 0:25 – Energy saving
- 0:28- Impermeability
- 0:32- Insulation
- 0:37- Planning and measurements.
- 1:05-Bracket and Thermal Insulation Installation.
- 1:23-Hc system Installation.
- 2:03-End of Hc System installation.
Glass Curtain Wall
- 0:12-fins
- 0:36-point fixed Facade.
- 1:26-point fixed fittings.
Videos Installation – Estarlin De La Rosa
Equitone Installation
0:00 Explanation 0:26 Tools 3:27 Luko 4:25 Drilling Equitone
5:11 Equitone on a metal frame 5:46 Visible rivet fixing
6:34 Fixed point- griping point 7:50 Sequence for mounting the panel
10:01 Equitone Natura, Natura pro, picture textural
13:05 Equitone fixed on timber 13:49 Equitone Natura and textural
14:21 Equitone Natura pro and pictura 14:42 Equitone tectiva
15:28 Horizontal joint profile 16:19 Invisible adhesive fixing
16:50 Tergo secret fix 17:43 Hanging hook 18:07 Supporting frames
Unitized Curtainwall
0:14 Surveying 0:48 Unloading 1:28 loading 2:08 Inspection
2:58 Installing the rail 3:00 Sealant 4:05 Seatting of chicken head
4:21 Alignment 4:53 Installation 7:40 Spider crane 8:14 Setting
Video Research Assignment – Dominik Jablonski
Video 1: VMZ Mozaik/Dri-Design panel
Link: https://www.youtube.com/watch?v=x_wx7puQcUA&feature=youtu.be
Time stamps:
- 0:00 – 0:18 Intro
- 0:18 – 0:53 Panel overview and manufacturing
- 0:53 – 2:25 Installation
- 2:25 – 3:11 Manufacturer information with building examples
Video 2: Unitized curtain wall installation
Link: https://www.youtube.com/watch?v=KYXpMkujo_8
Time stamps:
- 0:00 – 0:19 Intro
- 0:19 – 0:33 Glass panel assembly
- 0:33 – 0:46 Anchor installation
- 0:46 – 1:10 Panel installation
- 1:10 – 1:35 – Render overview
Curtain wall installation, 7250HRX Wausau WIndow and Wall Systems
Curtain wall installation
- 0:01 Crane Lift
- 0:21 Lowered Window
- 0:24 Exterior View of Alligment
- 0:41 Screwed bolts
- 1:08 Hooked in Place onto a bracket.
Opaque & Curtain Wall System Assembly
Trespa Meteon Panel Cladding
- 42 – Trespa Meteon Panel Put in place
- 46 – Horizontal J-Channel screwed onto a vertical J-Channel
- 109 – Panel screwed in place
- 115 – Panel being cut customed size on site
- 117 – Hooks being screwed on behind panel
Glass Fin Curtain Wall
- 01 – Glass fin being held up by Spider connection
- 13 – Bottom of glass fin supported & bolted to the floor by two L-shaped brackets
- 33 – Four-way (joint) spider
- 42 – Two-way (joint) spider
- 57 – One joint spider
- 123 – Right side one hand spider
- 135 – Left side one hand spider