Facade Material and Curtain Wall Installation

Metal Panels Installation Video

  • 0:13 : Tools
  • 0:40 : Rivet Attachment
  • 0:54 : Drilling Metal Base
  • 1:08 : Fastening Screws for Panel Attachment
  • 1:25 : Caulk Joint Attachment of Panels
  • 1:59 : Buildings with Panels

Curtain Wall Installation Video

  • 0:13 : Interior Framing
  • 0:22 : Glass Assembly
  • 0:33 : Thermal Barrier
  • 0:56 : Exterior Framing
  • 1:19 : Anchoring Assembly at Mullion
  • 2:02 : Installation of Glass Panels

 

 

Video Research – VMZINC (DRI-DESIGN) AND 1600SS CURTAIN WALL (KAWNEER) – DOLMA TSERING

VMZINC (DRI-DESIGN)

1:18 – BRACKETS INSTALLATION

1:28 – RAFTERS FIXED TO BRACKETS

1:33 – PERFORATED BASE TRIM INSTALLATION

1:51 – INSTALLATION OF INTERLOCKING PANELS

2:30 – INSTALLATION OF SPLICE PLATE

3:13 – FLASHING INSTALLATION

1600SS CURTAIN WALL (KAWNEER)

2:58 – INSTALLATION OF RAIL

3:04 – APPLYING SEALANT

4:14 – SETTING CHICKEN HEAD

4:59 – INSTALLING ANCHOR

6:19 – INSTALLATION OF CRITICAL SEAL

9:04 – SETTING THE UNITIZED PANEL

 

Kalzip FC rainscreebn System and Curtain wall installation

Kalzip FC rainscreen system – Louisiana Superdome, New Orleans
https://youtu.be/fTxb2fhDKr0

0:29- 1:40 manufacturing

2:22 overview of façade system

2:30- 2:51 installation sequence

  • Clips secured to wall,
  • “L” profile is attached to clips
  • Mullion Bar is attached to “L” profile
  • Retainer clips installed in mullion
  • siding is clipped in position

3:00- 5:30 Installation

  • L profile installation to adjustable bracket
  • Mullion bar clamped to L profile
  • Alignment of sub-framing
  • Mullion bar fastened to L profile
  • Trimming of panel ends
  • Panel installation

unitized curtain wall installation https://youtu.be/KYXpMkujo_8

0:36 Bracket Installation

0:57 Panel Installation

Video Research Assignment.

Neolith  Facade systems

Opaque Material – Hc System Installation.

  • 0:20 – Thermal insulation
  • 0:25 – Energy saving
  • 0:28- Impermeability
  • 0:32- Insulation
  • 0:37- Planning and measurements.
  • 1:05-Bracket and Thermal Insulation Installation.
  • 1:23-Hc system Installation.
  • 2:03-End of Hc System installation.

Glass Curtain Wall

  • 0:12-fins
  • 0:36-point fixed Facade.
  • 1:26-point fixed fittings.

Videos Installation – Estarlin De La Rosa

Equitone Installation

 

0:00 Explanation               0:26 Tools          3:27 Luko     4:25 Drilling Equitone

5:11 Equitone on a metal frame            5:46 Visible rivet fixing

6:34 Fixed point- griping point          7:50 Sequence for mounting the panel

10:01 Equitone Natura, Natura pro, picture textural

13:05 Equitone fixed on timber              13:49 Equitone Natura and textural

14:21 Equitone Natura pro and pictura               14:42 Equitone tectiva

15:28 Horizontal joint profile             16:19 Invisible adhesive fixing

16:50 Tergo secret fix        17:43 Hanging hook           18:07 Supporting frames

Unitized Curtainwall

0:14  Surveying       0:48   Unloading      1:28 loading       2:08 Inspection

2:58  Installing the rail       3:00 Sealant       4:05 Seatting of chicken head

4:21  Alignment       4:53  Installation      7:40  Spider crane       8:14  Setting

Video Research Assignment – Dominik Jablonski

Video 1: VMZ Mozaik/Dri-Design panel

Link: https://www.youtube.com/watch?v=x_wx7puQcUA&feature=youtu.be

Time stamps:

  • 0:00 – 0:18 Intro
  • 0:18 – 0:53 Panel overview and manufacturing
  • 0:53 – 2:25 Installation
  • 2:25 – 3:11 Manufacturer information with building examples

 

Video 2:  Unitized curtain wall installation

Link: https://www.youtube.com/watch?v=KYXpMkujo_8

Time stamps:

  • 0:00 – 0:19 Intro
  • 0:19 – 0:33 Glass panel assembly
  • 0:33 – 0:46 Anchor installation
  • 0:46 – 1:10 Panel installation
  • 1:10 – 1:35 – Render overview

Opaque & Curtain Wall System Assembly

Trespa Meteon Panel Cladding

  • 42 – Trespa Meteon Panel Put in place
  • 46 – Horizontal J-Channel screwed onto a vertical J-Channel
  • 109 – Panel screwed in place
  • 115 – Panel being cut customed size on site
  • 117 – Hooks being screwed on behind panel

Glass Fin Curtain Wall

  • 01 – Glass fin being held up by Spider connection
  • 13 – Bottom of glass fin supported & bolted to the floor by two L-shaped brackets
  • 33 – Four-way (joint) spider
  • 42 – Two-way (joint) spider
  • 57 – One joint spider
  • 123 – Right side one hand spider
  • 135 – Left side one hand spider