Opaque & Curtain Wall System Assembly

Trespa Meteon Panel Cladding

  • 42 – Trespa Meteon Panel Put in place
  • 46 – Horizontal J-Channel screwed onto a vertical J-Channel
  • 109 – Panel screwed in place
  • 115 – Panel being cut customed size on site
  • 117 – Hooks being screwed on behind panel

Glass Fin Curtain Wall

  • 01 – Glass fin being held up by Spider connection
  • 13 – Bottom of glass fin supported & bolted to the floor by two L-shaped brackets
  • 33 – Four-way (joint) spider
  • 42 – Two-way (joint) spider
  • 57 – One joint spider
  • 123 – Right side one hand spider
  • 135 – Left side one hand spider

Leave a Reply

Your email address will not be published. Required fields are marked *