Tuesday Presentation Deadline! – King

Now is the time to push yourself.  The harder you work from today until the Tuesday the easier the rest of the semester will be.  If anyone wants a one-on-one crit this weekend or Monday please email me.  Good luck!

For Tuesday we will have a graded preliminary pinup presentation.  You need to complete the layout of both your opaque wall and your glass curtain wall as well as develop “still image” animations showing assembly in PowerPoint.

For this presentation you should evaluate both horizontal and vertical formatting for your sheets.  Please refer to the previous post on the breakout assignment from Thursday. Here is a suggested methodology.

  1. In your project file choose the vertical format.

    • Create the necessary views for both the opaque and glass facades and arrange these images on the sheets.  You are likely to need to sheets for each.  Pay attention to the appropriate scale and the need to have coordinated plan, section, elevation and isometric views.
    • Save your file.
  2. Make a copy of your project file using “Save_as” or by copying the file.

    • In the copy switch the sheet types from Vertical to Horizontal.  Next re-arrange the same views on the Horizontal sheets.

If when you are attempting a layout you realize that is may not work well you can show images running slightly off the sheet or somewhat incomplete.

Your Presentation Includes

  • 4 sheets in vertical format (2 opaque/2 glass)
  • 4 sheets in horizontal format (2 opaque/2 glass)
  • PowerPoint Presentation with “still image animations”
    • One for Opaque
    • One for Glass Curtain Wall

Please remember to post your virtual  presentation on OpenLab

Select Category for your name, and under Presentations select Facade Preliminary

 

 

Facade Material and Curtain Wall Installation

Metal Panels Installation Video

  • 0:13 : Tools
  • 0:40 : Rivet Attachment
  • 0:54 : Drilling Metal Base
  • 1:08 : Fastening Screws for Panel Attachment
  • 1:25 : Caulk Joint Attachment of Panels
  • 1:59 : Buildings with Panels

Curtain Wall Installation Video

  • 0:13 : Interior Framing
  • 0:22 : Glass Assembly
  • 0:33 : Thermal Barrier
  • 0:56 : Exterior Framing
  • 1:19 : Anchoring Assembly at Mullion
  • 2:02 : Installation of Glass Panels

 

 

Video Research – VMZINC (DRI-DESIGN) AND 1600SS CURTAIN WALL (KAWNEER) – DOLMA TSERING

VMZINC (DRI-DESIGN)

1:18 – BRACKETS INSTALLATION

1:28 – RAFTERS FIXED TO BRACKETS

1:33 – PERFORATED BASE TRIM INSTALLATION

1:51 – INSTALLATION OF INTERLOCKING PANELS

2:30 – INSTALLATION OF SPLICE PLATE

3:13 – FLASHING INSTALLATION

1600SS CURTAIN WALL (KAWNEER)

2:58 – INSTALLATION OF RAIL

3:04 – APPLYING SEALANT

4:14 – SETTING CHICKEN HEAD

4:59 – INSTALLING ANCHOR

6:19 – INSTALLATION OF CRITICAL SEAL

9:04 – SETTING THE UNITIZED PANEL

 

Kalzip FC rainscreebn System and Curtain wall installation

Kalzip FC rainscreen system – Louisiana Superdome, New Orleans
https://youtu.be/fTxb2fhDKr0

0:29- 1:40 manufacturing

2:22 overview of façade system

2:30- 2:51 installation sequence

  • Clips secured to wall,
  • “L” profile is attached to clips
  • Mullion Bar is attached to “L” profile
  • Retainer clips installed in mullion
  • siding is clipped in position

3:00- 5:30 Installation

  • L profile installation to adjustable bracket
  • Mullion bar clamped to L profile
  • Alignment of sub-framing
  • Mullion bar fastened to L profile
  • Trimming of panel ends
  • Panel installation

unitized curtain wall installation https://youtu.be/KYXpMkujo_8

0:36 Bracket Installation

0:57 Panel Installation

Video Research Assignment.

Neolith  Facade systems

Opaque Material – Hc System Installation.

  • 0:20 – Thermal insulation
  • 0:25 – Energy saving
  • 0:28- Impermeability
  • 0:32- Insulation
  • 0:37- Planning and measurements.
  • 1:05-Bracket and Thermal Insulation Installation.
  • 1:23-Hc system Installation.
  • 2:03-End of Hc System installation.

Glass Curtain Wall

  • 0:12-fins
  • 0:36-point fixed Facade.
  • 1:26-point fixed fittings.

Videos Installation – Estarlin De La Rosa

Equitone Installation

 

0:00 Explanation               0:26 Tools          3:27 Luko     4:25 Drilling Equitone

5:11 Equitone on a metal frame            5:46 Visible rivet fixing

6:34 Fixed point- griping point          7:50 Sequence for mounting the panel

10:01 Equitone Natura, Natura pro, picture textural

13:05 Equitone fixed on timber              13:49 Equitone Natura and textural

14:21 Equitone Natura pro and pictura               14:42 Equitone tectiva

15:28 Horizontal joint profile             16:19 Invisible adhesive fixing

16:50 Tergo secret fix        17:43 Hanging hook           18:07 Supporting frames

Unitized Curtainwall

0:14  Surveying       0:48   Unloading      1:28 loading       2:08 Inspection

2:58  Installing the rail       3:00 Sealant       4:05 Seatting of chicken head

4:21  Alignment       4:53  Installation      7:40  Spider crane       8:14  Setting