Opaque & Curtain Wall System Assembly

Trespa Meteon Panel Cladding

  • 42 – Trespa Meteon Panel Put in place
  • 46 – Horizontal J-Channel screwed onto a vertical J-Channel
  • 109 – Panel screwed in place
  • 115 – Panel being cut customed size on site
  • 117 – Hooks being screwed on behind panel

Glass Fin Curtain Wall

  • 01 – Glass fin being held up by Spider connection
  • 13 – Bottom of glass fin supported & bolted to the floor by two L-shaped brackets
  • 33 – Four-way (joint) spider
  • 42 – Two-way (joint) spider
  • 57 – One joint spider
  • 123 – Right side one hand spider
  • 135 – Left side one hand spider

Case Study – Victor Centeno

Opaque Facade System:

  1. https://www.trespa.com/en-us/productinfo-en-us/trespa-meteon-wall-panels

PURA Lap siding

PURA Flush siding

2. https://www.hendrickcorp.com/architectural/products/arch-cladding/

perforated_metal_wall_panels_-_exposed_fastener_system_details perforated_metal_wall_panels_-_concealed_fastener_system_details

Glass Curtain Wall Systems:

    1. https://www.pilkington.com/en/us/products/product-categories/glass-systems/pilkington-planar#brochures

Pilkington_Planar_brochure

2. https://obe.com/product-category/curtain-wall/