EQUITONE Facade Panel Installation – Unitized Curtain Wall Installation

  • 0:07 EQUITONE panels visible installation system with rivet or screw
  • 0:09 Invisible fixing method with adhesive
  • 5:13 – 5:28 How rivet works
  • 6:09 The position of the rivet holes on the panel
  • 6:57 Panels on metal supporting frame with fixed and gliding points
  • 7:21 location of fixed points
  • 7:45 Rivet with sleeve for fixed points and without sleeve for gliding points
  • 7:55 Supporting metal frame with anchor points
  • 9:25 Measurement of panel placement
  • 11: 31 Foam  tape on the metal frame
  • 15: The position of horizontal aluminium joint profile
  • 16:43 Invisible adhesive fixing of panels ( supporting frame with foam and adhesive)
  • 17:28 Tergo secret fixing method (Half drilled panel with anchor, metal hook, washer and bolt)
  • 17:44 Hanging Hook system ( hanging hooks on the back of the panel)
  • 18:00 Adjustable top hanging hook

 

  • 2:14 lifted up curtain wall unit ready to be placed into the installed curtain wall frame

 

 

case study – Tea khabelashvili

High Performance Fibre Cement Panels -Equitone Facade Materials

https://www.equitone.com/en-us/documents-en-us/

TerraCore HoneyComb Stone Panels

https://www.triton-ca.com/neolith-sintered-stone-facade

case study: CHICAGO CHILDREN’S THEATRE,
CHICAGO (USA)

OBE (Old Castle)- Window Wall

https://obe.com/product-category/window-wall/

CASE STUDY : THE COOPER UNION

Wausau – Curtain Wall, Window Wall & Storefront

http://www.wausauwindow.com/index.cfm?pid=43&pageTitle=Product-Search-Results&pc=2

CASE STUDY: D.C.’S ATLANTIC PLUMBING RESIDENCES