Due on Wednesday March 19
Each of the three teams is to put together a Powerpoint presentation of possible long span structural solutions for the Gym and the Atrium Space. You should include as wide a range of materials and techniques as possible.
Materials can include wood, steel, concrete & specialty materials (Glu-Lam, Cable Structures, etc.)
For the Gym you need to span 100′
For the Atrium you can choose the span based on how many columns you want across the open space.
A case study should identify a material or system along with a building where it was used. You should provide the name of the project, the materials & the structural system used. Included the span and depth of structure.
If you were absent and were not made part of a team – either reach out to another classmate to join their team or complete your own independent research. You must still meet the same deadline.