Category Archives: Assignments

Final Presentation Schedule

Presentations are to be uploaded to blackboard by midnight the evening before your day of presentation. On Friday December 15th, the by midnight you will need to upload your final Revit model and a pdf of all your drawings, architectural … Continue reading

Posted in Assignments, Prof. King | Leave a comment

Only two working days of class left!

Next week December 4th and 6th are the last two classes where we do work.  We will focus on your details.  Each of you must complete two detail sheets like the sample below by Sunday Dec 3rd (this Sunday).  One … Continue reading

Posted in .Faculty, Assignments, Prof. King | Leave a comment

Wall Section Sheets Started for Monday

A-401      Solid Wall Section for Details A-402     Glass/Curtain wall Wall Section for Details Just get these started so we can work on these during class.

Posted in Assignments, Prof. King | Leave a comment

Graded – Architectural Set Presentation Due Friday by Midnight

Please include the following: A-000    Cover sheet   (include 2 3d images and the Architectural Drawings List (required) A-100    Basement Floor Plan (required) A-101     Level 1 Floor Plan (required) A-102    Level 2 Floor Plan (required) A-103    Level 3 Floor Plan (required) … Continue reading

Posted in Assignments, Prof. King | Leave a comment

GONZALEZ_FERNANDO_PROGRAMSPACEMATRIX

GONZALEZ_FERNANDO_PROGRAMSPACEMATRIX

Posted in Assignments | Leave a comment

ARCH2330_CURTAINWALL&SOLIDWALL_ARIANAKEVELIER

Arch2330_CurtainWall&SolidWall_ArianaKevelier

Posted in Assignments, Kevelier,Ariana | Leave a comment

Check deadline for space planning

Please post your space analysis chart both on OpenLab and in Blackboard by Tuesday evening.

Posted in Assignments, Prof. King | Leave a comment

ARCH 2330_Stick Curtain Wall System _Ying Ren

Ying Ren Stick Curtain Wall System

Posted in Assignments, Ren,Ying | Leave a comment

2330_F17_COMPOSITE PRECAST CONCRETE – STOREFRONT CURTAIN WALLS_CHARLIE TELES

Posted in Assignments, Students, Students MW 1130 | Leave a comment

Sunday Check Deadline for Revit

This is a non graded deadline to keep you moving.  Upload your Revit file and a PDF set of your Architectural Drawings  (do not include the structural drawings).  You need to complete the building enclosure including all exterior walls, foundations … Continue reading

Posted in Assignments, Prof. King | Leave a comment