-
Recent Posts
Recent Comments
- Solomane Fane on Submittal 1 – MAF
- Jonathan & Navjot / Concrete 2415 structural engineering team on Endirichard Jolalpa Structural Submission
- Felix on Trishita Athai (Group MAF) – Skeletal Framing
- engelberg & bratcher on LENNART MAGI SHEET SET IN A CORRECT CATEGORY
- Daria Trukhanova on Structural _framing _submittal_Prof.Aptekar_group_Archology
Archives
Categories
Meta
PRAM Presentation
This entry was posted in Uncategorized. Bookmark the permalink.
A bottom layer of concrete is poured on the casting bed. A second layer of concrete with collapsible tubes or light weight aggregate to form voids is deposited. The tubes or aggregates are removed after he concrete has cured.
I feel this presentation clearly showed the advantages and disadvantages of using the precast solid slab.
All the text and pictures go hand in hand, the pictures show clearly what the text is trying to say and vise-versa.
I found the presentation informative. Good job guys.
This group presented very uses information on manufacturing of hollow core slabs.
presentation was straight forward but it was information also.
The part that talk about the advantages and disadvantages of the hallow core slab is very helpful, it helps me a lot to decide which structure system to use for the structure.
And the connection detail in interesting. Thank you!