Monthly Archives: May 2020
Final posts Friday at noon and class Thursday at 10am May 21st
We will meet as a full class Thursday at 10am. Final posts to your blog are due Friday at noon. I will need to collect the site analysis/full zoning documents for the NAAB requirements, along with your full projects. I … Continue reading
Notes from jury
General comments from the presentation(these ar my notes β and not everything that was said..) Tolu β need to place in slide format. Kimberly β needs more exterior development or ideas of materials, ground floor plan would be … Continue reading
Presentation Schedule
Please be at the presentation for the entire time – Post your presentation by 6am on Monday so that I can send it out to the jury – you can keep working on items, but need something posted so they … Continue reading
Common Comments during the mock presentation
Orientate the plans so the Water side (East River is always on the top) Label all streets on all plans, sections, elevations North Arrow on all plans Keep the same orientation for site plans, floor plans Poche blow up apartment … Continue reading
May 12 Pre – Presentation Critique Markups
Karen John Julia Sergio Sol Flamur Jonathan Kimberly Kevin Josue Tolu
Final Drawings
1. Site Strategy Plan/diagram (site plan to be horizontal- North Arrow and Street names) 2. Concept Board β Collage, concept models, final hybrid β design process β Use your images onyour blog… with a final diagram showing how concept progressed … Continue reading
May 12th Full class meeting 9am-12pm – Mock Presentation
On Tuesday May 12th you will be required to attend the full class and review each others presentations. Presentations must be uploaded to your blogs. We will go in the order that we normally do for desk crits: Andres, Karen, … Continue reading
Length of Dead Ends – depending upon occupancy type 20 ft or 50 ft
IBC 2012 Section 1018.4 Dead ends. https://medium.com/@goSkwerl/what-is-a-dead-end-corridor-fbe9967c48c2 Where more than one exit or exit access doorway is required, the exit access shall be arranged such that there are no dead ends in corridors more than 20 feet (6096 mm) in … Continue reading
Zone 4 – The Bump
Assuming we are working with BIG’s design idea of moving the BQE below grade before it arrives at Atlantic Avenue – we need to consider the required changes of grade on the Zone 4 lot to allow for the exit/entrance … Continue reading
Final Presentation May 19, 2020 8:30-12:15pm
This is a list of the required final drawings for the presentation. The presentation is on Tuesday May 19th and drawings must be uploaded to your blog by Monday at 6am. The blogs will be sent out to the jury … Continue reading