Continue to work on your project and have the following complete at the start of class.
- Grids & Levels (from prior assignment)
- Add shaft openings for elevators, stairs and mechanical shafts
- Add stairs to the drawing
- Begin to create walls. – for each wall you must know the wall type and you must have this drawn on your partition sheet. Â So far you will need at least three walls as follows (shaft wall – 2 hr rated) (corridor wall- 1 hr rated) (demising or standard wall with 1 layer 5/8″ GWB each side of metal stud frame – unrated)
- During next class we will work on creating our own wall types and we will begin to add structural columns. Â After this we will work down to create the foundation walls and footings.