What to finish by next class meeting

Complete all Revit assignments for this project so far – including foundation, structure of lower level – concrete columns and beams.

Complete structure for the gym – steel columns from level 1 to the underside of the GYM truss and the trusses.  Use double LL double angle bean section for the truss.  Put  a peaked roof on the GYM – overhang of 3 to 4 feet.

Complete structure of the Atrium – steel tubular columns from level 1 to underside of Atrium truss.  Use a tubular section for the truss.

Complete steel columns and beams for the lab building from level 1 to level 2.  Size these correctly.

Complete the first floor structural slabs – all spaces.

Save a copy of the file after you complete these steps.  If you want to practice copying the building vertically then do so in a copy.

Please reply to this post if you have any questions.