Complete all Revit assignments for this project so far – including foundation, structure of lower level – concrete columns and beams.
Complete structure for the gym – steel columns from level 1 to the underside of the GYM truss and the trusses. Use double LL double angle bean section for the truss. Put a peaked roof on the GYM – overhang of 3 to 4 feet.
Complete structure of the Atrium – steel tubular columns from level 1 to underside of Atrium truss. Use a tubular section for the truss.
Complete steel columns and beams for the lab building from level 1 to level 2. Size these correctly.
Complete the first floor structural slabs – all spaces.
Save a copy of the file after you complete these steps. If you want to practice copying the building vertically then do so in a copy.
Please reply to this post if you have any questions.