Drawing Grading Rubric
Drawing Content: Building Elements
Exceeds requirements | Meets most requirements | Meets some requirements | Barely meets requirements |
4 pts | 3 pts | 2 pts | 1 pt |
All building elements are present | Most building elements are present | Some building elements are present, others missing | Few building elements are present, most missing |
Drawing Organization/Accuracy
Description: Setting out of grid and the relationship of elements to the grid is accurate
Exceeds requirements | Meets most requirements | Meets some requirements | Barely meets requirements |
4 pts | 3 pts | 2 pts | 1 pt |
In addition, all drawing elements are carefully located in relationship to centerlines and the structural grid | In addition, major elements (walls, columns) are accurately placed in relation to the structural grid | In addition, structural grid is dimensioned accurately and labeled correctly | Structural Grid is established |
Lineweights
Description: Distinguishing elements especially cut lines (poche’), grid lines, transparent elements, finishes
Exceeds requirements | Meets most requirements | Meets some requirements | Barely meets requirements |
4 pts | 3 pts | 2 pts | 1 pt |
In addition, transparency is clear, centerlines, grid lines, dimension lines are shown w/ correct line type and line weight. | In addition, three or more line weights are distinguishable, including some finish textures | In addition, two line weights are distinguishable, including cut line | Lines are consistent thickness and quality, in the correct alignment |
Construction Guidelines
Description: Guidelines/construction lines were utilized in the careful construction of each drawing
Exceeds requirements | Meets most requirements | Meets some requirements | Barely meets requirements |
4 pts | 3 pts | 2 pts | 1 pt |
In addition, guidelines are accurate, working off of grid lines and centerlines to each major element and guiding alignments | In addition, guidelines indicate geometric center of spaces, perimeters of spaces, and grid locations of key elements | In addition, guidelines indicate orthographic projection | Guidelines are used for overall geometry of drawings |
Drawing Conventions/Coordination
Description: Standard methods of drawing and documentation of key data and elements are utilized and coordinated
Exceeds requirements | Meets most requirements | Meets some requirements | Barely meets requirements |
4 pts | 3 pts | 2 pts | 1 pt |
In addition, drawings are consistent and coordinated and indicate clear understanding of drawing types and layers of information | In addition, drawings are organized on sheet to ensure proper projection from plan to elevation to section detail | In addition, detail drawings are referenced to each other using cut lines and tags | Drawings are properly scaled and provided with a title including course #, student name, professor name, semester + year |
Print this page
Leave a Reply