Reminder of two deadlines for Tuesday – all posted by Monday midnight – do not be late!

  • Connections Assignment (3A.3 Steel Connections First Draft 3)
  • Post your progress for the connections assignment to blackboard – Revit file and PDF
    • First sheet updated (do not print or plot this sheet)
    • Second details sheet (plot this one – 22 x 34 large size)
      • Like the scavenger hunt details assignment focus on the development of details of the connections of beams/columns/footing.
      • Remember to always have the 4 view s- Plan/2 Elevations or Section combo, and 1 isometric.  Add Annotation, Notes and Dimensions, Add materials or detail items as needed.
  • Case study building group presentation (1A.2 Case Study Team Presentation)
  • This is a team effort – all members must contribute.
  • Follow the outline provided (follow this link)
  • Please put your initials on any slide you contributed to.
  • Only 1 member of the team needs to upload the PowerPoint – please make sure that the last names of each team member is in the file name.  Add a comment when you upload- listing the names of your team members.  Whatever format you use please convert and upload a PDF to blackboard.
  • File Name – CaseStudy-BldgName-TeamMemberNames.PDF

Case Study Slides Outline

  • Cover Sheet with Team Member Names & Photos
  • Location/Architect/Year Built/Client
  • Grid location and dimensions
  • Floor to Floor dimensions
  • Location of central core
  • Location of stairs and egress plan
  • Exterior Facade Materials
  • Interior Ceilings – Lighting and Ventilation System
  • Interior Materials and Furnishing
    • (remember to cite your sources!!!)
    • (Add initials of each student who contributes to a given slide – in the corner)

Please finalize your Case Study Selection

Each of you will need to finalize your case study selections.  It will be best if you work in teams of 2 to 3 on a building.  You will be able to share your research but you will each draw separately.  Drawing files or Revit Project files and families may not be shared.  There will be a case study team presentations next week.

https://openlab.citytech.cuny.edu/ar2431btech3sp20profking/resources/case-study-buildings/

Scavenger Hunt Best Sheet Grade

Please note that there are two columns for grade statistics.  The first column is based on the work shown at pinup. 5  student grades were lowered due to lateness of posting your files on Blackboard.

This included 2 students with A- grades (lowered to B+), 3 students with B grades (lowered to B-) and one B- grade (lowered to C+)

The second grade column  statistics after the grades were lowered.

It is important that you meet this deadline and that you submit on time.

Current Deadline Clarifications

Scavenger Hunt Best Sheet:

For the Scavenger Hunt Best Sheet plot full size 22 x 34. This is to include annotation (notes & dimensions) with detail items and hatch patterns.  This should be posted to Blackboard as both a PDF and your Revit file.  You are plotting just this one sheet – no cover etc.

Steel Connections Assignment:

For the connections assignment – you do not need to print as we have just started this assignment. You are only required to upload this to blackboard and bring in your file for us to continue working.  Upload your Revit file and an 11 x 17 PDF of your sheet layout.

Scavenger Hunt Deadlines – Important Please Read

Your deadline for upload is tonight by Midnight.  Pinup tomorrow.  Please make certain you read the assignment description below and review the Rubric.

Note:  In class we spent a good deal of time answering questions.  As a result we did not cover how to create a perspective view and how to make a drawings list.  As a result the cover sheet (SH-0.01) which includes this information will be optional for this assignment.

Scavenger Hunt Deadlines

You have two deadlines this week for the Scavenger Hunt Assembly  Search

  • Tuesday – preliminary pinup and review. 
    • Requires an upload of PDF and Revit file to Blackboard by Midnight Monday February 3rd.  Late Assignments will not be accepted.
  • Thursday – Final Pinup and grading.  
    • Requires an upload of PDF and Revit file to Blackboard by Midnight Wednesday February 5th.  Late assignments will be downgraded.

Remember to print on 11 x 17 for in class pinup.