Category: Prof. Sherman
Facade Preliminary Win Myint Aung
Ousmane Camara Revit Screen Capture
Opaque Facade
Metal Panel Cladding
https://www.wiremeshfacade.com/wiremeshfacade/perforated-metal-mesh.html
Joined by mesh clip
https://www.clarkdietrich.com/products/drift-connections/drift-fastclip-slide-clip-d-fcsc#description
INSTALLATION VIDEOS-TENLY LAW
TIME STAMPS:
0:03-0:12 SPIDER CLIP ASSEMBLY
0:16-0:26 GLASS PANEL ASSEMBLY
0:28-0:53 GLASS PANEL AND SPIDER INSTALLATION ASSEMBLY
TIME STAMPS:
1:36-2:35 STEEL FRAME INSTALLATION
2:42-2:53 LOWER STEEL WALL INSTALLATION
2:55-3:15 MORE STEEL FRAME INSTALLATION
3:17-6:06 REPITITION OF STEEL FRAME AND STEEL WALL PANEL INSTALLATION
Video Research – VMZINC (DRI-DESIGN) AND 1600SS CURTAIN WALL (KAWNEER) – DOLMA TSERING
VMZINC (DRI-DESIGN)
1:18 – BRACKETS INSTALLATION
1:28 – RAFTERS FIXED TO BRACKETS
1:33 – PERFORATED BASE TRIM INSTALLATION
1:51 – INSTALLATION OF INTERLOCKING PANELS
2:30 – INSTALLATION OF SPLICE PLATE
3:13 – FLASHING INSTALLATION
1600SS CURTAIN WALL (KAWNEER)
2:58 – INSTALLATION OF RAIL
3:04 – APPLYING SEALANT
4:14 – SETTING CHICKEN HEAD
4:59 – INSTALLING ANCHOR
6:19 – INSTALLATION OF CRITICAL SEAL
9:04 – SETTING THE UNITIZED PANEL
J Sherman_Research Index Btech III
Dear students:
Please see link below for the video research and posting from 4/14 class.
Prof. Sherman
https://docs.google.com/spreadsheets/d/1LCeH5Tnl0xMOjxa35DIrIda9s4leRpqMnPAYCwN1H8E/edit#gid=0
Modified Grading Percentages & Class Schedule – All sections
To accommodate the loss of time and the modified schedule for the Spring of 2020 we have updated the grading percentages for the various projects assigned this semester. We will spend the rest of the semester focused on the two 3D model assemblies (Opaque & Glass Curtain Wall).
We will not go back to working on the Revit drawing set. Each professor will notify you about any additional collection dates for this drawing set.
Updated Schedule | |||
WK | Topic | Tuesday | Thursday |
Week 1 | Exterior Backup Wall | 14-Apr | 16-Apr |
Week 2 | Curtain Wall Systems Overview | 21-Apr | 23-Apr |
Week 3 | Structural Glazed Curtain Wall | 28-Apr | 30-Apr |
Week 4 | Parapets & Footings | 5-May | 7-May |
Week 5 | Windows & Doors | 12-May | 14-May |
Week 6 | Final Presentations | 19-May | 21-May |