Arch2431_ SP2020_Assignment Animation_Ousmane Camara Ousmane Camara
Category: 6:00 PM – 9:00 PM – Sherman
Dree-Nica Preliminary Facade Presentation
presentation assignment
FACADE STUDIES- DOLMA TSERING
Presentation + Facade Sheets(Horizontal)
Presentation sheet Win Myint Aung
Facade Preliminary Win Myint Aung
Ousmane Camara Revit Screen Capture
INSTALLATION VIDEOS-TENLY LAW
TIME STAMPS:
0:03-0:12 SPIDER CLIP ASSEMBLY
0:16-0:26 GLASS PANEL ASSEMBLY
0:28-0:53 GLASS PANEL AND SPIDER INSTALLATION ASSEMBLY
TIME STAMPS:
1:36-2:35 STEEL FRAME INSTALLATION
2:42-2:53 LOWER STEEL WALL INSTALLATION
2:55-3:15 MORE STEEL FRAME INSTALLATION
3:17-6:06 REPITITION OF STEEL FRAME AND STEEL WALL PANEL INSTALLATION
Video Research – VMZINC (DRI-DESIGN) AND 1600SS CURTAIN WALL (KAWNEER) – DOLMA TSERING
VMZINC (DRI-DESIGN)
1:18 – BRACKETS INSTALLATION
1:28 – RAFTERS FIXED TO BRACKETS
1:33 – PERFORATED BASE TRIM INSTALLATION
1:51 – INSTALLATION OF INTERLOCKING PANELS
2:30 – INSTALLATION OF SPLICE PLATE
3:13 – FLASHING INSTALLATION
1600SS CURTAIN WALL (KAWNEER)
2:58 – INSTALLATION OF RAIL
3:04 – APPLYING SEALANT
4:14 – SETTING CHICKEN HEAD
4:59 – INSTALLING ANCHOR
6:19 – INSTALLATION OF CRITICAL SEAL
9:04 – SETTING THE UNITIZED PANEL