Videos Installation – Estarlin De La Rosa

Equitone Installation

 

0:00 Explanation               0:26 Tools          3:27 Luko     4:25 Drilling Equitone

5:11 Equitone on a metal frame            5:46 Visible rivet fixing

6:34 Fixed point- griping point          7:50 Sequence for mounting the panel

10:01 Equitone Natura, Natura pro, picture textural

13:05 Equitone fixed on timber              13:49 Equitone Natura and textural

14:21 Equitone Natura pro and pictura               14:42 Equitone tectiva

15:28 Horizontal joint profile             16:19 Invisible adhesive fixing

16:50 Tergo secret fix        17:43 Hanging hook           18:07 Supporting frames

Unitized Curtainwall

0:14  Surveying       0:48   Unloading      1:28 loading       2:08 Inspection

2:58  Installing the rail       3:00 Sealant       4:05 Seatting of chicken head

4:21  Alignment       4:53  Installation      7:40  Spider crane       8:14  Setting

Video Research Assignment – Dominik Jablonski

Video 1: VMZ Mozaik/Dri-Design panel

Link: https://www.youtube.com/watch?v=x_wx7puQcUA&feature=youtu.be

Time stamps:

  • 0:00 – 0:18 Intro
  • 0:18 – 0:53 Panel overview and manufacturing
  • 0:53 – 2:25 Installation
  • 2:25 – 3:11 Manufacturer information with building examples

 

Video 2:  Unitized curtain wall installation

Link: https://www.youtube.com/watch?v=KYXpMkujo_8

Time stamps:

  • 0:00 – 0:19 Intro
  • 0:19 – 0:33 Glass panel assembly
  • 0:33 – 0:46 Anchor installation
  • 0:46 – 1:10 Panel installation
  • 1:10 – 1:35 – Render overview

Opaque & Curtain Wall System Assembly

Trespa Meteon Panel Cladding

  • 42 – Trespa Meteon Panel Put in place
  • 46 – Horizontal J-Channel screwed onto a vertical J-Channel
  • 109 – Panel screwed in place
  • 115 – Panel being cut customed size on site
  • 117 – Hooks being screwed on behind panel

Glass Fin Curtain Wall

  • 01 – Glass fin being held up by Spider connection
  • 13 – Bottom of glass fin supported & bolted to the floor by two L-shaped brackets
  • 33 – Four-way (joint) spider
  • 42 – Two-way (joint) spider
  • 57 – One joint spider
  • 123 – Right side one hand spider
  • 135 – Left side one hand spider

Neolith Facade USA, Efficient solutions – Spider Fitting

Neolith Facades USA – HC System installation

  • 0:25 – 0:46 Technical features
  • 0:47 – Closing by Concrete block
  • 0:49 Closing by Mat Sheathing
  • 0:53 Closing by OSB panel
  • 1:02 – Addition of Vapor Barrier
  • 1:11 – Installation of Aluminum Brackets
  • 1:19 – Thermal Insulation Installation
  • 1:31 – Used Materials
  • 1:34 – Installation of Vertical Profile T
  • 1:48 – Addition of  Double sided tape on Vertical Profile T
  • 1:54 – Addition of Chemical-Elastic Fixation on Vertical Profile T
  • 1:57 – 2:16 Installation of Stone Veneer Panels
Spider Fitting

  • 0:20 – 0:24 Four ways Spider Fitting

 

 

EQUITONE Facade Panel Installation – Unitized Curtain Wall Installation

  • 0:07 EQUITONE panels visible installation system with rivet or screw
  • 0:09 Invisible fixing method with adhesive
  • 5:13 – 5:28 How rivet works
  • 6:09 The position of the rivet holes on the panel
  • 6:57 Panels on metal supporting frame with fixed and gliding points
  • 7:21 location of fixed points
  • 7:45 Rivet with sleeve for fixed points and without sleeve for gliding points
  • 7:55 Supporting metal frame with anchor points
  • 9:25 Measurement of panel placement
  • 11: 31 Foam  tape on the metal frame
  • 15: The position of horizontal aluminium joint profile
  • 16:43 Invisible adhesive fixing of panels ( supporting frame with foam and adhesive)
  • 17:28 Tergo secret fixing method (Half drilled panel with anchor, metal hook, washer and bolt)
  • 17:44 Hanging Hook system ( hanging hooks on the back of the panel)
  • 18:00 Adjustable top hanging hook

 

  • 2:14 lifted up curtain wall unit ready to be placed into the installed curtain wall frame

 

 

Opaque Material – Rain screen / Cladding Systems

Rain screen / Cladding Systems Start  T=30 End at 205.

  • 30    Shows the cassettes being mechanically folded from one piece of metal with a self-draining-gutter
  • 55 Shows the PPC – Polyester Coating
  • 109 Metallic, standard, and textured to any RAL or BS color
  • 119 Installed over insulated panel
  • 125 Shows first cassette being hooked on the J rail then fixed to the panel
  • 133 Subsequent cassettes hook into the neighbor
  • 152 Showing the different design cassettes.
  • 205 End Here