Facade Material and Curtain Wall Installation

Metal Panels Installation Video

  • 0:13 : Tools
  • 0:40 : Rivet Attachment
  • 0:54 : Drilling Metal Base
  • 1:08 : Fastening Screws for Panel Attachment
  • 1:25 : Caulk Joint Attachment of Panels
  • 1:59 : Buildings with Panels

Curtain Wall Installation Video

  • 0:13 : Interior Framing
  • 0:22 : Glass Assembly
  • 0:33 : Thermal Barrier
  • 0:56 : Exterior Framing
  • 1:19 : Anchoring Assembly at Mullion
  • 2:02 : Installation of Glass Panels

 

 

Video Research – VMZINC (DRI-DESIGN) AND 1600SS CURTAIN WALL (KAWNEER) – DOLMA TSERING

VMZINC (DRI-DESIGN)

1:18 – BRACKETS INSTALLATION

1:28 – RAFTERS FIXED TO BRACKETS

1:33 – PERFORATED BASE TRIM INSTALLATION

1:51 – INSTALLATION OF INTERLOCKING PANELS

2:30 – INSTALLATION OF SPLICE PLATE

3:13 – FLASHING INSTALLATION

1600SS CURTAIN WALL (KAWNEER)

2:58 – INSTALLATION OF RAIL

3:04 – APPLYING SEALANT

4:14 – SETTING CHICKEN HEAD

4:59 – INSTALLING ANCHOR

6:19 – INSTALLATION OF CRITICAL SEAL

9:04 – SETTING THE UNITIZED PANEL

 

Video Research Assignment.

Neolith  Facade systems

Opaque Material – Hc System Installation.

  • 0:20 – Thermal insulation
  • 0:25 – Energy saving
  • 0:28- Impermeability
  • 0:32- Insulation
  • 0:37- Planning and measurements.
  • 1:05-Bracket and Thermal Insulation Installation.
  • 1:23-Hc system Installation.
  • 2:03-End of Hc System installation.

Glass Curtain Wall

  • 0:12-fins
  • 0:36-point fixed Facade.
  • 1:26-point fixed fittings.

Video Research Assignment – Dominik Jablonski

Video 1: VMZ Mozaik/Dri-Design panel

Link: https://www.youtube.com/watch?v=x_wx7puQcUA&feature=youtu.be

Time stamps:

  • 0:00 – 0:18 Intro
  • 0:18 – 0:53 Panel overview and manufacturing
  • 0:53 – 2:25 Installation
  • 2:25 – 3:11 Manufacturer information with building examples

 

Video 2:  Unitized curtain wall installation

Link: https://www.youtube.com/watch?v=KYXpMkujo_8

Time stamps:

  • 0:00 – 0:19 Intro
  • 0:19 – 0:33 Glass panel assembly
  • 0:33 – 0:46 Anchor installation
  • 0:46 – 1:10 Panel installation
  • 1:10 – 1:35 – Render overview

Opaque & Curtain Wall System Assembly

Trespa Meteon Panel Cladding

  • 42 – Trespa Meteon Panel Put in place
  • 46 – Horizontal J-Channel screwed onto a vertical J-Channel
  • 109 – Panel screwed in place
  • 115 – Panel being cut customed size on site
  • 117 – Hooks being screwed on behind panel

Glass Fin Curtain Wall

  • 01 – Glass fin being held up by Spider connection
  • 13 – Bottom of glass fin supported & bolted to the floor by two L-shaped brackets
  • 33 – Four-way (joint) spider
  • 42 – Two-way (joint) spider
  • 57 – One joint spider
  • 123 – Right side one hand spider
  • 135 – Left side one hand spider

Neolith Facade USA, Efficient solutions – Spider Fitting

Neolith Facades USA – HC System installation

  • 0:25 – 0:46 Technical features
  • 0:47 – Closing by Concrete block
  • 0:49 Closing by Mat Sheathing
  • 0:53 Closing by OSB panel
  • 1:02 – Addition of Vapor Barrier
  • 1:11 – Installation of Aluminum Brackets
  • 1:19 – Thermal Insulation Installation
  • 1:31 – Used Materials
  • 1:34 – Installation of Vertical Profile T
  • 1:48 – Addition of  Double sided tape on Vertical Profile T
  • 1:54 – Addition of Chemical-Elastic Fixation on Vertical Profile T
  • 1:57 – 2:16 Installation of Stone Veneer Panels
Spider Fitting

  • 0:20 – 0:24 Four ways Spider Fitting

 

 

EQUITONE Facade Panel Installation – Unitized Curtain Wall Installation

  • 0:07 EQUITONE panels visible installation system with rivet or screw
  • 0:09 Invisible fixing method with adhesive
  • 5:13 – 5:28 How rivet works
  • 6:09 The position of the rivet holes on the panel
  • 6:57 Panels on metal supporting frame with fixed and gliding points
  • 7:21 location of fixed points
  • 7:45 Rivet with sleeve for fixed points and without sleeve for gliding points
  • 7:55 Supporting metal frame with anchor points
  • 9:25 Measurement of panel placement
  • 11: 31 Foam  tape on the metal frame
  • 15: The position of horizontal aluminium joint profile
  • 16:43 Invisible adhesive fixing of panels ( supporting frame with foam and adhesive)
  • 17:28 Tergo secret fixing method (Half drilled panel with anchor, metal hook, washer and bolt)
  • 17:44 Hanging Hook system ( hanging hooks on the back of the panel)
  • 18:00 Adjustable top hanging hook

 

  • 2:14 lifted up curtain wall unit ready to be placed into the installed curtain wall frame