outline
Author: Prof. Paul King
Cast in Channel Steel
Shows formwork with edge connectors – both edge of slab and recessed top of slab
PEC Group Cast in Channel
Hilti FireStop System
- Hilti FireStop System Start T=52 End at 144
-
- 52 Shows assembly Yellow=FireStopping Red=SmokeSeal
- 60 Shows movement capability of system
- 110 Skip from here to 138
- 138 Shows assembly of system
- 144 End here
-
HiLTi Anchor Channel Filler vs Competitors
- HiLTi Anchor Channel Filler vs Competitors
-
- 4 View of Hilti Channel Connector with Filler
- 11 Removal of Hilti Filler by pulling tape edge
- 30 Removal of competitors filler material
- 46 Closeup of Hilti Filler with tape edge for pulling
-
Hilti HAC Edge – Top of Slab Curtain Wall Connector
- Hilto HAC Edge Start t=0 watch to 5:30
-
- 0 View of Edge Bracket Assembly
- 17 Bracket with top J-plate
- 24 Corner bracket
- 29 Adjustable bracket
- 36 View of connection to Modular Unitized Curtain wall
- 42 View of Edge Bracket Channel
- 49 Bracket to connect Edge plate w/rebars to Channel Bracket
- 59 Distance from edge is adjustable
- 105 Slotted head bolts rotated and bolted to angles
- 107 Stress of tightening of bolt can crack and weaken edge of slab
- 125 Horizontal Rebar helps to redirect stress away from edge
- 144 Edge Plate attached to rebars prevents edge of slab from cracking
- 205 Edge plate and rebars work together
- 211 Graph showing stress comparison
- 220 Installation on wood formwork – shows slab reinforcing
- 230 Concrete is poured
- 235 Use of Brackets in corner condition
-
Scans of Sketches from Tuesday Desk Crits
Allface RainScreen Cladding System
- Allface System F1.10 (Rainscreen Cladding) Start t=110 watch to 5:30
-
- 38 Drawing showing layout of wall connectors
- 110 Straight Level Line to locate angles
- 112 Anchor Positions
- 118 Pre-Drill Holes using Masonry Drill Bit
- 142 Installation of 2 bolt aluminum angles
- 150 Installation of 1 bolt aluminum angles
- 205 Shows installed angles
- 210 Installation of Mineral Wool “Rockwool” “Roxul” insulation with fasterners
- 250 Installation of vertical “T” channels – angle clips allow for adjustment
- 258 Screws into holes for fixed connection to T
- 310 Screws into slotted connections for moveable connection to T – allows for movement due to expansion & contraction
- 325 Note “Black” material between aluminum angle and concrete as a thermal break
- 340 Next set of vertical “T” channels installed. Note space to allow for expansion and contraction.
- 420 Installation of Panels
- 436 Spacers to maintain equal joints between panels
- 443 Location of connection points on panels – note fixed positions vs moveable
- 445 Pre-drilled holes in panels are visible
- 450 Drill holes in aluminum T aligned with panel holes
- 457 Installation of Blind Rivets –
- 528 Diagram showing fixed and moveable rivet locations
- 533 Shows how adjustable faster works – hole is bigger than Rivet
- 550 Stop video here
-
HALFEN – Fixing Systems – Curtain Wall to Concrete
- halfen.com website fixing-systems
- PDF Catalog -Review Pages 11-13, 17, 43-44, 68, 71-72, 74, 76, 79-80
- hcw-curtain-wall-system edge of slab connector
- HALFEN Curtain Wall Connector Edge of Slab Start t=28 watch to 1:32
-
- 28 View of Wood formwork for Concrete Slab
- 35 Channel nailed to wood formwork
- 40 Reinforcing rebars for slab and pouring of concrete
- 48 Form work removed & styrofoam removed from channel
- 53 Parallelogram headed bolts inserted – rotate as tightened
- 57 Paired aluminum angles w/slots for vertical & horizontal motion
- 107 Square washer & bolt
- 110 Vertical mullion of curtain wall
- 112 Bolting of mullion to edge of slab angles
- 120 Overall view of curtain wall system
- 126 Halfen Edge of Slab Assembly
-
- HALFEN Curtain Wall Connector Top of Slab Start t=25 watch to 2:08
-
- 25 Setting Form work with channel
- 45 Pouring Concrete Slab
- 100 Shows recess in slab after formwork is removed
- 114 Shows J-connector Plate bolted to channel
- 125 Shows Curtain Wall Connected to J-Connector Plate
- 148 Show installation of Fire Safing/Stopping
- 154 Show application of Smoke Seal (Red)
- 208 Stop watching here
-
- HALFEN Curtain Wall Connector Top of Slab Start t=20 watch to 2:15
Shows Unitized Curtain Wall Installation using Top Connector
-
- 20 Setting the channel in the formwork – flush to top of slab
- 25 Pouring Concrete Slab
- 111 Shows J-connector Plate bolted to channel
- 123 Unitized Curtainwall panels lowered into place
- 145 Panel Hook connected to J-Plate
- 156 Next Panel lowered and connected to previous panel
- 215 Stop watching here
-
How to Set a YouTube Video to start at a specific time ?t=35
-
- In this example I added the following to the end of the YouTube Link ?t=35
This will cause the video to start 35 seconds after the beginning
- In this example I added the following to the end of the YouTube Link ?t=35
(https://youtu.be/ZUBLdZ74zY8?t=35)
- Please do this for links where you are highlighting a portion of the video. See an example of how to title your video
- HALFEN Curtain Wall Connector HTA Channel Start at t=35 watch to 1:32